2x | | BCB5-6 |
2x | | HNTPZ5-5 |
1x | | MHPUS102-19-23-S |
Tips
- Installing the cable carrier is best delayed until later. For running the cables though it it needs to be opened. This is best done when flat on a table.
Measurements
- The cable carrier's lower attachment point needs to be tested out later. With the drive belts in place and the wires installed find a point that does not cause stress for the entire range of motion.
Details